29 October 2026 Kisangani--:--
TSHOPO MOSALA News

News from Tshopo, straight to the point

Breaking news
Kisangani: SNEL announces more power cuts as the Tshopo power station drops to 11 MWCheckpoints: “We are going to dismantle all the barriers,” the Governor pledgesLocal media: the provincial government says it supports RTNC and more than ten media outlets under contract“How do you expect these neighbourhood chiefs to work under the mango tree?”: the Governor makes the case for officesOral question: MP Senold Tandia Akomboyo calls for inquiry commissions on roads and revenue agenciesRussia-Africa Summit: Félix Tshisekedi in Moscow alongside 48 African delegations“My ethics and my upbringing do not allow me to embezzle money,” says the GovernorBengamisa and Wanierukula: the Governor bets on industrialisationOral question with debate: Governor Paulin Lendongolia faces the provincial MPsThe Governor calls for the revenue agency to be depoliticisedTshopo Airlines: an air operator's licence obtainedKisangani: the march against Rwandan aggression draws a particularly large crowdThe Governor receives the memorandum of UNIKIS's unpaid PhD holdersBuilding engineers received by the Governor: a cut in the price of cement announcedBarely back in Kisangani, the Governor tours the building sites2026-2027 school year: official launch at the Athénée de Kisangani
Society

Kisangani: SNEL announces more power cuts as the Tshopo power station drops to 11 MW

Rising waters on the Congo River are cutting output at the Tshopo power station, while the city needs 45 MW. Electricity will be supplied in rotation.

Translated from French · Read the original

Kisangani: SNEL announces more power cuts as the Tshopo power station drops to 11 MW

The national electricity company (SNEL) announced on Thursday 29 October 2026 an increase in power cuts in Kisangani.

The cause: rising waters on the Congo River, which are reducing output at the Tshopo hydroelectric power station. It now supplies only 11 megawatts (MW), while the city needs 45 MW.

Key points

  • Tshopo power station output: 11 MW
  • Kisangani's needs: 45 MW
  • Electricity supplied in rotation at certain sites

To cope with the shortfall, electricity will be supplied in rotation at certain sites. SNEL has apologised to its customers.

In pictures